Angola’s Dalia Field to Undergo Maintenance

Connect with us:

Angola. oil. Bigstock

The TotalEnergies-operated Dalia Field offshore Angola will undergo a planned 35-day maintenance period, resulting in lower cargo exports for March 2023.

Scheduled to begin on February 20, the maintenance program will consist of inspections of equipment, subsea lines and works relating to flare tips. Brought online in 2006, the Dalia Field is located in Block 17 – TotalEnergies “golden block” – and contributes more than 200,000 barrels per day (bpd) to Angola’s oil output.

Production at the field is tied back to the Dalia FPSO, which has a processing capacity of 240,000 bpd.

Other Reads

Other Reads

Grace Goodrich

Grace Goodrich

Grace Goodrich is a Publications Editor at Energy Capital & Power, where she writes about the intersection of energy, policy and global finance in sub-Saharan Africa's fastest-growing economies. Grace produces our Africa Energy Series investment reports in Angola and Equatorial Guinea (2019), as well as co-authored African Energy Chamber: Road to Recovery (2021).

More from the Author

Explorando o Potencial Upstream de Angola
As principais bacias de Angola possuem consideráveis reservas inexploradas – estimadas em 57 mil milhões de barris de petróleo e 27 trilhões de pés cúbicos de gás natural – que estão a resultar em oportunidades de desenvolvimento em cada estágio do ciclo de vida da exploração.

Sign up for latest news and event info

Copyright © 2023 Energy Capital & Power. Privacy Policy · Terms of Use